Immeuble industriel CERATIZIT

Maître d'ouvrage
Ceratizit Luxembourg S.à r.l., Mamer
Architecte
Bureau d’Architectes Cubus S.à r.l., Schrassig
Ingénieur en génie-civil
AuCARRE Ingénieurs-Conseils, Luxembourg
lieu d'exécution
Mamer
Réalisation
2014-2017
Surface totale
12.000 m²

Key data :

  • Production of carbide cutting tools, offices, research laboratory, canteen, production kitchen, changing rooms in a single building.
  • 17 different technical gases, including hydrogen (H2) for production.
  • Sintering furnaces with high connected load (up to 1,000 A), busbar supply 2,500 A.
  • Production areas cooled by 36 recirculating air coolers with 20 kW, 2 air-cooled chillers with 680 kW on the roof.
  • 8 ventilation units with a total capacity of 82,000 m3/h.
  • Recooling of process water (26/320C), 2 x 1000 kW hybrid chillers.
  • Recooling of the air compressors, 850 kW hybrid cooler.
  • Complete lighting with LED technology.