Rehazenter Kirchberg

Maître d'ouvrage
Centre national de rééducation fonctionnelle et de réadaptation
Architecte
m3 Architectes S.A., Luxembourg
Incopa, Saarbrücken
Ingénieur en génie-civil
InCA Ingénieurs Conseils Associés
lieu d'exécution
Luxembourg
Réalisation
2004-2007
Surface totale
38.700 m²

Key data :

  • Offered medical services: Neurology, traumatology/orthopaedics, functional explorations, medical imaging and laboratory
  • The building complex includes a large sports hall, 2 swimming pools, an auditorium, a production kitchen (dietetics), a restaurant and a number of workshops for functional rehabilitation, such as physiotherapy, ergotherapy, weight training, etc.
  • 24 double rooms and 24 single rooms with adapted bathrooms
  • Outdoor and underground car parks with 350 parking spaces
  • Connection to district heating, boiler and emergency generator, and all other technical installations to guarantee the well-being and safety of the occupants
Plus de détails